Rehm Park & Pool

Plan Created: 2008
Plan Reviewed: 2016
Next Review: Oct 14, 2026

Continued investment in our parks and facilities is critical to the District’s mission. The Park Board’s policy states that each park site plan will be revisited and updated within a 10-year period. The Park District is in the process of revisiting each park site plan per this policy in order to identify additional park amenities desired by our residents, to budget strategically for these improvements and to be prepared for grant opportunities.

If you have questions or would like to provide feedback on park plans currently in progress, please contact Bill Hamilton, Superintendent of Parks & Planning.

Past Plans

Check out the latest updates:

Timeline Icon

November

Pool filled and waterslides tested in preparation for permitting.

Timeline Icon

October

Pool tiles and lily pad crossing structures installed.

Timeline Icon

August

Waterslides installed.

Blue and green spiral water slides with blue stairs at Rehm Park & Pool.
Timeline Icon
Construction workers pour concrete into a pool basin at Rehm Park & Pool using a concrete pump.

July

The pool deck is being poured, a process that requires seven truckloads of concrete.

Timeline Icon

June

The interior of the filter house is nearing completion. Drain pipes are being installed, then the deck will be poured. The interior of the pool is being prepped for tiling.

Industrial pumps and piping system in a concrete room at Rehm Park & Pool.
Timeline Icon
Construction of Rehm Park & Pool exterior wall with insulation and brick veneer in progress. Metal ties protrude from cinder

May

Pump house is being bricked and lights cut during excavation were reestablished.

Timeline Icon

April

Work on the pump room continues. Water hold test was conducted to check for leaks.

Construction of Rehm Park & Pool, showing a partially filled pool, a building under construction, and an excavator.
Timeline Icon
Construction site at Rehm Park & Pool with concrete forms for pillars and a concrete pump hose.

April

Piers for waterslides poured and installed.

Timeline Icon

April

Shade trellises installed.

Construction of a shade trellis structure at Rehm Park & Pool with scaffolding and building materials visible.
Timeline Icon
Newly poured concrete steps at Rehm Park & Pool construction site. A building and construction materials are visible in the

March-April

Pool stair concrete poured.

Timeline Icon

March

Electrical tubing installed and tile color and material selected.

Construction of a curved pool edge with white tiles and blue mosaic tiles being installed.
Timeline Icon
Construction of Rehm Park & Pool building with cinder block walls and wooden roof trusses. Foundation work is visible in the

March

Roof trusses installed, with roof to be installed the week of March 17.

Timeline Icon

March

Concrete poured into the pool wall frames. Frames will be removed once concrete sets.

Construction of Rehm Park & Pool: concrete pump truck pouring foundation walls, with cinder block building in background.
Timeline Icon
Construction of Rehm Park & Pool shows concrete forms for a pool and a cinder block building under construction.

March

Pool wall work continues. Check out the new current channel!

Timeline Icon

February

Pool wall installed amidst snowy conditions.

Construction workers in winter conditions building a pool foundation with rebar and wooden forms at Rehm Park & Pool.
Timeline Icon
Construction workers pour concrete using a pump truck at the Rehm Park & Pool site.

February

Concrete poured on February 4. The team worked hard to beat the incoming rain and ice.

Timeline Icon

January

Gravel compacted and rebar installed.

Rehm Park & Pool construction site with foundation forms and rebar in place, and a building under construction in the
Timeline Icon
Construction site with concrete foundation, rebar, and plumbing pipes laid out. A worker operates a compactor.

January

Piping under the pool shell completed and inspected.

Timeline Icon

November-December

Path work done on the new pumphouse building, in addition to laying foundations, footings, and masonry walls.

Construction of the Rehm Park & Pool pumphouse, showing cinder block walls and exposed foundation with rebar.
Timeline Icon
Rehm Park & Pool features a bright blue swimming pool with two blue water slides, a diving board, and surrounding concrete

September

Existing diving well structure removed and the hole filled.

Acquired in 1913, Rehm Park was originally called “South Park” but was subsequently renamed after Colonel Arthur D. Rehm, a member of the Park District’s first Board of Commissioners and its second Board President. The original park was designed by Jens Jensen, although little of Jensen’s design remains. The play train has been at Rehm playground since at least 1960. An outdoor pool was constructed in 1966 and quickly became a destination. While remediation was taking place at Barrie Park in 2001, Rehm hosted the “Temporary Barrie Center” double-wide trailer north of the diving well.